US 90 West Trail Feasibility Study (Gadsden County)

The CRTPA region is fortunate to have an extensive regional trail system that continues to grow.  One of the efforts towards expanding the region’s trail system is the recent initiation of a feasibility study on US 90 in Gadsden County.  The US 90 West Trail Feasibility Study was initiated in 2025 to explore the feasibility of constructing a paved 10 to 12-foot multi-use trail along US 90 West from Chattahoochee east to SR 12 in Quincy, a distance of approximately 22 miles.  Specifically, the study’s limits are the Jackson/Gadsden county line (western limits) to SR 12 at the Quincy Bypass/Julia Munroe Woodward Highway/SR 269 (eastern limits).

Funding for the study is being provided by Florida’s Shared-Use Non-motorized (SUN) Trail Program and the US 90 corridor is part of the SUN Trail network.  More information about the study may be found on the project’s information sheet.

 

 

 

Font Resize